{"id":114097,"date":"2020-10-22T05:03:19","date_gmt":"2020-10-22T05:03:19","guid":{"rendered":"https:\/\/www.controleng.com\/articles\/developing-a-great-sequence-of-operations-additional-answers\/"},"modified":"2025-04-23T18:54:21","modified_gmt":"2025-04-23T23:54:21","slug":"developing-a-great-sequence-of-operations-additional-answers","status":"publish","type":"post","link":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/","title":{"rendered":"Developing a great sequence of operations: Additional answers"},"content":{"rendered":"<p>Emergency parallel switchgear\u00a0is\u00a0vital\u00a0to a\u00a0building\u2019s resiliency\u00a0or for processes inside, and\u00a0the\u00a0sequence of\u00a0operation\u00a0(SoO)\u00a0for\u00a0starting and stopping\u00a0emergency parallel switchgear\u00a0rarely receives the same level of attention.\u00a0Sequence of operation\u00a0parts, including considerations and what makes a good\u00a0SoO,\u00a0were covered in an Oct. 8, hour-long\u00a0training course on the topic. Also covered was\u00a0how transfer switches could be prioritized based on code and operation of the\u00a0sequence of operation\u00a0system.<\/p>\n<p>A live question and answer (Q&amp;A) session followed\u00a0the training,\u00a0\u201c<a href=\"https:\/\/cfeedu.cfemedia.com\/courses\/developing-a-great-sequence-of-operations\">Developing a great sequence of operations<\/a>&#8221; produced by CFE Media and Technology, owner of <em><a href=\"https:\/\/www.controleng.com\/\">Control Engineering<\/a>,\u00a0<a href=\"https:\/\/www.plantengineering.com\/\">Plant Engineering<\/a>,\u00a0Consulting-Specifying Engineer<\/em>, and\u00a0<a href=\"https:\/\/cfeedu.cfemedia.com\/\">CFE Edu<\/a>\u00a0online\u00a0training.<\/p>\n<p>Additional answers to questions not addressed in the Q&amp;A follow below.\u00a0Answering the\u00a0seven\u00a0questions below was one of the instructors for the presentation (archived through December), Zach Goldsworthy, LEED AP BD&amp;C, national healthcare market leader, Siemens Industry Inc.<\/p>\n<h3>Seven answers for sequence of operations\u00a0applications<\/h3>\n<p><strong>1. Regulatory requirements aside, how many other applications might benefit from electrical sequence of operations and why?<\/strong><\/p>\n<p>Any electrical distribution that has automated operation should have a sequence of operation developed, which should include different operations\/sources along with failure scenarios.<\/p>\n<p><strong>2. Even though the sequence of operation is automated, can we still have manual operation?<\/strong><\/p>\n<p>Yes, the manual operation option is best practice and allows additional flexibility. It is also recommended that additional or follow up training is included.<\/p>\n<p><strong>3. If sequence of operations changes because of equipment failure are there requirements for time for repairs to reduce risk?<\/strong><\/p>\n<p>There are no published\u00a0or\u00a0required times for equipment to be repaired but best and recommended practice is as soon as possible to minimize the risk to the facility, occupants and community. This is also why many facilities require levels of redundancy.<\/p>\n<p><strong>4. Are there often overlooked details you\u2019d like to point out about sequence of operations?<\/strong><\/p>\n<p>Unfortunately,\u00a0failure modes are not always thoroughly considered. Most systems have a single sequence that does not consider other variations. Additionally,\u00a0if the system is expected to be response to failures or modes, the detailed sequence allows the system to be more responsive and resilient.<\/p>\n<p><strong>5. Are retrofit considerations different than working with new equipment? In what ways?<\/strong><\/p>\n<p>Yes, retrofit projects need to take into account existing conditions and the overall ability of the\u00a0emergency parallel switchgear and related\u00a0equipment; this would include generators to parallel or in older transfer switches the ability to be shed.<\/p>\n<p><strong>6. What are documentation requirements or best practices for sequence of operations? Does it vary by industry or by application?<\/strong><\/p>\n<p>At the beginning of the project a comprehensive one-line diagram along with a thorough understanding of the facility is critical for understanding the full scope. At the end of the project, thorough as-builts and narrative are required.<\/p>\n<p>I also recommend reviewing the as-builts and sequence of operation at the end of the project with the complete team. The facility type or industry does not change the best practice recommendations but it is more important in critical power facilities,\u00a0such as data centers, healthcare,\u00a0and other areas, including critical industrial applications where power loss would be costly or dangerous.<\/p>\n<p><strong>7. Is there anything else you would like to explain or emphasize?<\/strong><\/p>\n<p>Thorough site investigation and review of the project scope are critical for a successful sequence of operation. Engagement with the manufacturer is also recommended to understand the impacts of the layout or configuration on\u00a0emergency parallel switchgear and related\u00a0equipment.<\/p>\n<p>&#8211; Edited by Mark T. Hoske, content manager, <a href=\"https:\/\/www.controleng.com\/\"><em>Control Engineering<\/em><\/a>, CFE Media and Technology, <a href=\"mailto:mhoske@cfemedia.com\">mhoske@cfemedia.com<\/a>.<\/p>\n<h3>MORE INSIGHTS<\/h3>\n<p><strong>KEYWORDS:<\/strong> Sequence of operations, emergency parallel switchgear<\/p>\n<p><strong>LEARNING OBJECTIVES\u00a0<\/strong><\/p>\n<p><strong>Review\u00a0risk considerations<\/strong>\u00a0related to sequence of operation for emergency parallel switchgear and related equipment used in critical power applications.<\/p>\n<p><strong>Consider<\/strong> sequence of operation\u00a0failure modes, retrofit and repairs.<\/p>\n<p><strong>Learn\u00a0about<\/strong>\u00a0documentation\u00a0best practices for sequence of operations.<\/p>\n<p><strong>CONSIDER THIS\u00a0<\/strong><\/p>\n<p><strong>Need a refresher course<\/strong>\u00a0on sequence of operations for emergency parallel switchgear?<\/p>\n<p>ONLINE extra<\/p>\n<p>usa.siemens.com\/powerdistribution\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Applications, repairs and risk reduction, failure modes, retrofits, documentation and project scope are among additional information provided for developing a critical power sequence of operation. Take related training with a quiz for one continuing education unit (CEU).<\/p>\n","protected":false},"author":826,"featured_media":114098,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[106334],"tags":[],"tracking-metrics":[],"display-location":[],"class_list":{"2":"type-post"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Developing a great sequence of operations: Additional answers - Control Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Developing a great sequence of operations: Additional answers - Control Engineering\" \/>\n<meta property=\"og:description\" content=\"Applications, repairs and risk reduction, failure modes, retrofits, documentation and project scope are among additional information provided for developing a critical power sequence of operation. Take related training with a quiz for one continuing education unit (CEU).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/\" \/>\n<meta property=\"og:site_name\" content=\"Control Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ControlEngineeringMagazine\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-22T05:03:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-23T23:54:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"645\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Zach Goldsworthy\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@controlengtips\" \/>\n<meta name=\"twitter:site\" content=\"@controlengtips\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Zach Goldsworthy\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/\"},\"author\":{\"name\":\"Zach Goldsworthy\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/person\/851bb37521ba7b7dc1c4845ff74085ce\"},\"headline\":\"Developing a great sequence of operations: Additional answers\",\"datePublished\":\"2020-10-22T05:03:19+00:00\",\"dateModified\":\"2025-04-23T23:54:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/\"},\"wordCount\":675,\"publisher\":{\"@id\":\"https:\/\/www.controleng.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg\",\"articleSection\":[\"Educational Facilities\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/\",\"url\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/\",\"name\":\"Developing a great sequence of operations: Additional answers - Control Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.controleng.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg\",\"datePublished\":\"2020-10-22T05:03:19+00:00\",\"dateModified\":\"2025-04-23T23:54:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage\",\"url\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg\",\"contentUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg\",\"width\":645,\"height\":350,\"caption\":\"Courtesy: Siemens Industry\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.controleng.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Developing a great sequence of operations: Additional answers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.controleng.com\/#website\",\"url\":\"https:\/\/www.controleng.com\/\",\"name\":\"Control Engineering\",\"description\":\"Control Engineering covers and educates about automation, control and instrumentation technologies\",\"publisher\":{\"@id\":\"https:\/\/www.controleng.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.controleng.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.controleng.com\/#organization\",\"name\":\"Control Engineering\",\"url\":\"https:\/\/www.controleng.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png\",\"contentUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png\",\"width\":300,\"height\":93,\"caption\":\"Control Engineering\"},\"image\":{\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ControlEngineeringMagazine\",\"https:\/\/x.com\/controlengtips\",\"https:\/\/www.linkedin.com\/company\/control-engineering-magazine\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/person\/851bb37521ba7b7dc1c4845ff74085ce\",\"name\":\"Zach Goldsworthy\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c9073fb67029c6973a3f38aed74afd52ac57c508342f6f3f3e89e8f777fd55f8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c9073fb67029c6973a3f38aed74afd52ac57c508342f6f3f3e89e8f777fd55f8?s=96&d=mm&r=g\",\"caption\":\"Zach Goldsworthy\"},\"url\":\"https:\/\/www.controleng.com\/author\/zach-goldsworthy\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Developing a great sequence of operations: Additional answers - Control Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/","og_locale":"en_US","og_type":"article","og_title":"Developing a great sequence of operations: Additional answers - Control Engineering","og_description":"Applications, repairs and risk reduction, failure modes, retrofits, documentation and project scope are among additional information provided for developing a critical power sequence of operation. Take related training with a quiz for one continuing education unit (CEU).","og_url":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/","og_site_name":"Control Engineering","article_publisher":"https:\/\/www.facebook.com\/ControlEngineeringMagazine","article_published_time":"2020-10-22T05:03:19+00:00","article_modified_time":"2025-04-23T23:54:21+00:00","og_image":[{"width":645,"height":350,"url":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg","type":"image\/jpeg"}],"author":"Zach Goldsworthy","twitter_card":"summary_large_image","twitter_creator":"@controlengtips","twitter_site":"@controlengtips","twitter_misc":{"Written by":"Zach Goldsworthy","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#article","isPartOf":{"@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/"},"author":{"name":"Zach Goldsworthy","@id":"https:\/\/www.controleng.com\/#\/schema\/person\/851bb37521ba7b7dc1c4845ff74085ce"},"headline":"Developing a great sequence of operations: Additional answers","datePublished":"2020-10-22T05:03:19+00:00","dateModified":"2025-04-23T23:54:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/"},"wordCount":675,"publisher":{"@id":"https:\/\/www.controleng.com\/#organization"},"image":{"@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg","articleSection":["Educational Facilities"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/","url":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/","name":"Developing a great sequence of operations: Additional answers - Control Engineering","isPartOf":{"@id":"https:\/\/www.controleng.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage"},"image":{"@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg","datePublished":"2020-10-22T05:03:19+00:00","dateModified":"2025-04-23T23:54:21+00:00","breadcrumb":{"@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#primaryimage","url":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg","contentUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/11\/CTL2011_MAG1_TU_Siemens-VTWday4session3-Sequence-of-Operations-Modes-1.jpg","width":645,"height":350,"caption":"Courtesy: Siemens Industry"},{"@type":"BreadcrumbList","@id":"https:\/\/www.controleng.com\/developing-a-great-sequence-of-operations-additional-answers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.controleng.com\/"},{"@type":"ListItem","position":2,"name":"Developing a great sequence of operations: Additional answers"}]},{"@type":"WebSite","@id":"https:\/\/www.controleng.com\/#website","url":"https:\/\/www.controleng.com\/","name":"Control Engineering","description":"Control Engineering covers and educates about automation, control and instrumentation technologies","publisher":{"@id":"https:\/\/www.controleng.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.controleng.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.controleng.com\/#organization","name":"Control Engineering","url":"https:\/\/www.controleng.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png","contentUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png","width":300,"height":93,"caption":"Control Engineering"},"image":{"@id":"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ControlEngineeringMagazine","https:\/\/x.com\/controlengtips","https:\/\/www.linkedin.com\/company\/control-engineering-magazine\/"]},{"@type":"Person","@id":"https:\/\/www.controleng.com\/#\/schema\/person\/851bb37521ba7b7dc1c4845ff74085ce","name":"Zach Goldsworthy","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.controleng.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c9073fb67029c6973a3f38aed74afd52ac57c508342f6f3f3e89e8f777fd55f8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c9073fb67029c6973a3f38aed74afd52ac57c508342f6f3f3e89e8f777fd55f8?s=96&d=mm&r=g","caption":"Zach Goldsworthy"},"url":"https:\/\/www.controleng.com\/author\/zach-goldsworthy\/"}]}},"_links":{"self":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/posts\/114097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/users\/826"}],"replies":[{"embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/comments?post=114097"}],"version-history":[{"count":0,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/posts\/114097\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/media\/114098"}],"wp:attachment":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/media?parent=114097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/categories?post=114097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/tags?post=114097"},{"taxonomy":"tracking-metric","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/tracking-metrics?post=114097"},{"taxonomy":"display-location","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/display-location?post=114097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}