{"id":131163,"date":"2025-06-10T17:58:03","date_gmt":"2025-06-10T22:58:03","guid":{"rendered":"https:\/\/www.controleng.com\/?p=131163"},"modified":"2025-06-18T10:49:11","modified_gmt":"2025-06-18T15:49:11","slug":"faqs-on-the-global-system-integrator-report-2025-and-answers","status":"publish","type":"post","link":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/","title":{"rendered":"FAQs on the Global System Integrator Report, 2025, and\u00a0answers"},"content":{"rendered":"\n<p>To help automation and&nbsp;control&nbsp;industry system integration experts participate&nbsp;in&nbsp;the Global System Integrator Report for 2025, please see the answers below to&nbsp;frequently asked questions&nbsp;(FAQs).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is the Global System Integrator Report?<\/h2>\n\n\n\n<p>The Global System Integrator Report is an&nbsp;annual&nbsp;supplement to&nbsp;<em>Control Engineering<\/em>&nbsp;and&nbsp;<em>Plant Engineering<\/em>, part of the print edition mailing and digital edition for&nbsp;November\/December. It contains case studies, trend articles, research and recognition (awards) important to those who perform control system integration and automation system integration, including System Integrator of the Year and System Integrator Giants. While the print and digital edition contains considerable knowledge, even more appears&nbsp;online.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What\u2019s the theme for the 2025 Global System Integrator Report?<\/h2>\n\n\n\n<p>This year&#8217;s theme is \u201cNavigating challenges using automation and system integration,\u201d in part based on&nbsp;<em>Control Engineering<\/em>&nbsp;research that identified the economy, workforce shortages and tariffs as leading threats to subscribers in the coming year. Solutions to those issues&nbsp;include&nbsp;new automation installations, automation upgrades,&nbsp;artificial intelligence\/machine learning, smart manufacturing and&nbsp;control&nbsp;system optimization. System integrators and those&nbsp;who perform or help with system integration improve upon and enable new and existing technologies.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How do I submit&nbsp;an&nbsp;article for the 2025 Global System Integrator Report?<\/h2>\n\n\n\n<p>If you have expert knowledge about automation and control system integration to share with peers, WTWH Media invites you to submit an article for consideration for the 2025 Global System Integrator Report (GSIR) published in the\u00a0December\u00a0issues of\u00a0<em>Control\u00a0Engineering<\/em>\u00a0and\u00a0<em>Plant Engineering<\/em>\u00a0publications. Please plan to deliver the article on or before July 21, 2025.<strong>\u00a0<\/strong>To help, please use the following.\u00a0<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">GSIR article workflows&nbsp;checklist<\/h3>\n\n\n\n<p>1. If you need&nbsp;a&nbsp;refresher, learn more about&nbsp;<em><a href=\"http:\/\/www.controleng.com\">Control Engineering&nbsp;<\/a><\/em>and<em>&nbsp;<a href=\"http:\/\/www.plantengineering.com\">Plant Engineering<\/a><\/em>.<\/p>\n\n\n\n<p>2. Let Mark Hoske and Gary Cohen know about&nbsp;your&nbsp;intent to submit (see contact info below). PR firms or writers seeking to contribute articles on behalf of clients must disclose client names and contact info with the article proposal before you begin.<\/p>\n\n\n\n<p>3. Articles should&nbsp;include:<\/p>\n\n\n\n<div class=\"wp-block-group has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>a. Engineering&nbsp;content, quantifications, examples, must be tutorial in nature and not read like an advertisement: Tell don\u2019t sell in 600 to 6,000 words in&nbsp;a&nbsp;Microsoft&nbsp;Word or RTF file. Exclude mentions of vendors\/suppliers&nbsp;in&nbsp;the body of the article; include them only&nbsp;in&nbsp;image captions.&nbsp;Include&nbsp;three sentences (learning objectives) of what&nbsp;someone&nbsp;will&nbsp;learn by reading.&nbsp;<\/p>\n\n\n\n<p>b. One non-tracking&nbsp;URL&nbsp;back to the&nbsp;source;&nbsp;author&nbsp;name, title and&nbsp;company;&nbsp;a 25- to 75-word author&nbsp;biography telling qualifications to be&nbsp;an&nbsp;author; and&nbsp;author&nbsp;image for use&nbsp;online.<\/p>\n\n\n\n<p>c. Separate files with original images, graphics&nbsp;or&nbsp;tables that support the article\u2019s premise, with&nbsp;company&nbsp;name&nbsp;in&nbsp;the filename, 300 dpi&nbsp;in&nbsp;separate JPEG, TIFF or EPS files at 4&#215;6 inches if used&nbsp;in&nbsp;the article, up to 9 x 11 inches, if to be <a href=\"https:\/\/www.controleng.com\/global-system-integrator-report\/\">considered for the magazine&nbsp;cover<\/a>. The best article image&nbsp;in the issue is chosen. We cannot accept stock or third-party images.<\/p>\n\n\n\n<p>d. Please get all final approvals on&nbsp;your&nbsp;end before submission.<\/p>\n\n\n\n<p>e. Headline and deck (article summary) as shown&nbsp;in&nbsp;articles&nbsp;<a href=\"http:\/\/www.controleng.com\">here<\/a>.<\/p>\n<\/div>\n\n\n\n<p>4. Articles should not be submitted to or already used by other publications. Please honor&nbsp;a&nbsp;six-month exclusive as explained&nbsp;in&nbsp;the&nbsp;<a href=\"https:\/\/www.controleng.com\/unpaid-license-agreement\/\">author&nbsp;and image agreement and file submission tool<\/a>.<\/p>\n\n\n\n<p>5. Accepted articles are confirmed once and published&nbsp;online&nbsp;first and may be selected for use&nbsp;in&nbsp;newsletters, eBooks, syndication and print\/digital editions. We&nbsp;will&nbsp;make every effort to publish within three&nbsp;months&nbsp;of the intended issue, unless&nbsp;otherwise&nbsp;noted.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"562\" src=\"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/GSIR2511-COVER-1024x562.png\" alt=\"Get answers to your frequently asked questions about the next Global System Integrator Report, from Control Engineering\u00a0and\u00a0Plant Engineering, part of WTWH Media. Show here is the November\/December 2024 edition of the Global System Integrator Report. Courtesy: Control Engineering, Plant Engineering, WTWH Media\" class=\"wp-image-131170\" srcset=\"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/GSIR2511-COVER-1024x562.png 1024w, https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/GSIR2511-COVER-300x165.png 300w, https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/GSIR2511-COVER-768x421.png 768w, https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/GSIR2511-COVER.png 1181w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Get answers to your frequently asked questions about the next Global System Integrator Report, from Control Engineering&nbsp;and&nbsp;Plant Engineering, part of WTWH Media. Show here is the November\/December 2024 edition of the Global System Integrator Report. Courtesy: Control Engineering, Plant Engineering, WTWH Media<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">How do I submit&nbsp;a&nbsp;nomination for the next System Integrator of the Year for the 2025 Global System Integrator Report?<\/h2>\n\n\n\n<p>System Integrator of the Year for 2026&nbsp;includes&nbsp;winners&nbsp;in&nbsp;three categories as identified by&nbsp;a&nbsp;panel of industry judges. <a href=\"https:\/\/www.controleng.com\/system-integrator-of-the-year-nominations\">Nominations opened June&nbsp;2<\/a>. Applications are due Aug. 29 for consideration&nbsp;in&nbsp;the 2025 GSIR.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How do I&nbsp;ensure&nbsp;my system integrator&nbsp;firm&nbsp;or the one that I use is included&nbsp;<a><u>i<\/u><\/a>n&nbsp;the System Integrator Giants list?<\/h2>\n\n\n\n<p><a href=\"https:\/\/www.controleng.com\/system-integrator-giants\">System Integrator Giants<\/a> are the largest firms identified by system integration revenue. Submissions opened June 2, 2025. Please submit before the deadline. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Can I advertise in the 2025 Global System Integrator Report?<\/h2>\n\n\n\n<p>Other resources, such as advertising, help system integrators and others who perform system integration are part of the Global System Integrator Report. Advertising deadline is Oct. 31, 2025.  Contact <a href=\"jpinsel@wtwhmedia.com\">Judy Pinsel<\/a> for answers about participating in these value-added activities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How do I get answers for other questions about the 2025 Global System Integrator Report, or how do I submit suggestions to improve the next edition?<\/h2>\n\n\n\n<p>Send other questions or suggestions to&nbsp;<a href=\"mailto:mhoske@wtwhmedia.com\">mhoske@wtwhmedia.com<\/a>&nbsp;or&nbsp;<a href=\"mailto:gcohen@wtwhmedia.com\">gcohen@wtwhmedia.com<\/a>.&nbsp;<\/p>\n\n\n\n<p>Thank you.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Get answers to frequently asked questions (FAQs) about how to participate in the next Global System Integrator Report from Control Engineering and Plant Engineering, part of WTWH Media.<\/p>\n","protected":false},"author":1319,"featured_media":131171,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[104164],"tags":[110200,110306,109340,110216,110309,110305,110310,110304,110308,109393,110307,110311],"tracking-metrics":[],"display-location":[109353],"class_list":{"2":"type-post"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>FAQs on the Global System Integrator Report, 2025, and\u00a0answers - Control Engineering<\/title>\n<meta name=\"description\" content=\"Get answers to frequently asked questions (FAQs) about how to participate in the next Global System Integrator Report from Control Engineering and Plant Engineering, part of WTWH Media.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FAQs on the Global System Integrator Report, 2025, and\u00a0answers - Control Engineering\" \/>\n<meta property=\"og:description\" content=\"Get answers to frequently asked questions (FAQs) about how to participate in the next Global System Integrator Report from Control Engineering and Plant Engineering, part of WTWH Media.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/\" \/>\n<meta property=\"og:site_name\" content=\"Control Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ControlEngineeringMagazine\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-10T22:58:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-18T15:49:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1472\" \/>\n\t<meta property=\"og:image:height\" content=\"832\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"WTWH Media, LLC\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@controlengtips\" \/>\n<meta name=\"twitter:site\" content=\"@controlengtips\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"WTWH Media, LLC\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/\"},\"author\":{\"name\":\"WTWH Media, LLC\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/person\/0720f3911ac28c678dfe08782da7e8b7\"},\"headline\":\"FAQs on the Global System Integrator Report, 2025, and\u00a0answers\",\"datePublished\":\"2025-06-10T22:58:03+00:00\",\"dateModified\":\"2025-06-18T15:49:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/\"},\"wordCount\":920,\"publisher\":{\"@id\":\"https:\/\/www.controleng.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg\",\"keywords\":[\"automation system integration\",\"automation system integrator\",\"control engineering\",\"control system integration\",\"control system integrator\",\"Global System Integrator Report\",\"Global System Integrator Report frequently asked questions\",\"GSIR\",\"GSIR FAQs\",\"Plant Engineering\",\"submitting articles to the Global System Integrator Report\",\"submitting articles to the GSIR\"],\"articleSection\":[\"System Integration\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/\",\"url\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/\",\"name\":\"FAQs on the Global System Integrator Report, 2025, and\u00a0answers - Control Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.controleng.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg\",\"datePublished\":\"2025-06-10T22:58:03+00:00\",\"dateModified\":\"2025-06-18T15:49:11+00:00\",\"description\":\"Get answers to frequently asked questions (FAQs) about how to participate in the next Global System Integrator Report from Control Engineering and Plant Engineering, part of WTWH Media.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage\",\"url\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg\",\"contentUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg\",\"width\":1472,\"height\":832,\"caption\":\"Courtesy: WTWH Media\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.controleng.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"FAQs on the Global System Integrator Report, 2025, and\u00a0answers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.controleng.com\/#website\",\"url\":\"https:\/\/www.controleng.com\/\",\"name\":\"Control Engineering\",\"description\":\"Control Engineering covers and educates about automation, control and instrumentation technologies\",\"publisher\":{\"@id\":\"https:\/\/www.controleng.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.controleng.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.controleng.com\/#organization\",\"name\":\"Control Engineering\",\"url\":\"https:\/\/www.controleng.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png\",\"contentUrl\":\"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png\",\"width\":300,\"height\":93,\"caption\":\"Control Engineering\"},\"image\":{\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ControlEngineeringMagazine\",\"https:\/\/x.com\/controlengtips\",\"https:\/\/www.linkedin.com\/company\/control-engineering-magazine\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/person\/0720f3911ac28c678dfe08782da7e8b7\",\"name\":\"WTWH Media, LLC\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.controleng.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1a83181ac6a585839d531ef9c671e43aa2b789f85c10fd373ad3600ce1863632?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1a83181ac6a585839d531ef9c671e43aa2b789f85c10fd373ad3600ce1863632?s=96&d=mm&r=g\",\"caption\":\"WTWH Media, LLC\"},\"url\":\"https:\/\/www.controleng.com\/author\/wtwh-media-llc\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"FAQs on the Global System Integrator Report, 2025, and\u00a0answers - Control Engineering","description":"Get answers to frequently asked questions (FAQs) about how to participate in the next Global System Integrator Report from Control Engineering and Plant Engineering, part of WTWH Media.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/","og_locale":"en_US","og_type":"article","og_title":"FAQs on the Global System Integrator Report, 2025, and\u00a0answers - Control Engineering","og_description":"Get answers to frequently asked questions (FAQs) about how to participate in the next Global System Integrator Report from Control Engineering and Plant Engineering, part of WTWH Media.","og_url":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/","og_site_name":"Control Engineering","article_publisher":"https:\/\/www.facebook.com\/ControlEngineeringMagazine","article_published_time":"2025-06-10T22:58:03+00:00","article_modified_time":"2025-06-18T15:49:11+00:00","og_image":[{"width":1472,"height":832,"url":"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg","type":"image\/jpeg"}],"author":"WTWH Media, LLC","twitter_card":"summary_large_image","twitter_creator":"@controlengtips","twitter_site":"@controlengtips","twitter_misc":{"Written by":"WTWH Media, LLC","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#article","isPartOf":{"@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/"},"author":{"name":"WTWH Media, LLC","@id":"https:\/\/www.controleng.com\/#\/schema\/person\/0720f3911ac28c678dfe08782da7e8b7"},"headline":"FAQs on the Global System Integrator Report, 2025, and\u00a0answers","datePublished":"2025-06-10T22:58:03+00:00","dateModified":"2025-06-18T15:49:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/"},"wordCount":920,"publisher":{"@id":"https:\/\/www.controleng.com\/#organization"},"image":{"@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg","keywords":["automation system integration","automation system integrator","control engineering","control system integration","control system integrator","Global System Integrator Report","Global System Integrator Report frequently asked questions","GSIR","GSIR FAQs","Plant Engineering","submitting articles to the Global System Integrator Report","submitting articles to the GSIR"],"articleSection":["System Integration"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/","url":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/","name":"FAQs on the Global System Integrator Report, 2025, and\u00a0answers - Control Engineering","isPartOf":{"@id":"https:\/\/www.controleng.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage"},"image":{"@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg","datePublished":"2025-06-10T22:58:03+00:00","dateModified":"2025-06-18T15:49:11+00:00","description":"Get answers to frequently asked questions (FAQs) about how to participate in the next Global System Integrator Report from Control Engineering and Plant Engineering, part of WTWH Media.","breadcrumb":{"@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#primaryimage","url":"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg","contentUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2025\/06\/Create-an-image-that-illustrates-system-integrators-at-work.jpg","width":1472,"height":832,"caption":"Courtesy: WTWH Media"},{"@type":"BreadcrumbList","@id":"https:\/\/www.controleng.com\/faqs-on-the-global-system-integrator-report-2025-and-answers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.controleng.com\/"},{"@type":"ListItem","position":2,"name":"FAQs on the Global System Integrator Report, 2025, and\u00a0answers"}]},{"@type":"WebSite","@id":"https:\/\/www.controleng.com\/#website","url":"https:\/\/www.controleng.com\/","name":"Control Engineering","description":"Control Engineering covers and educates about automation, control and instrumentation technologies","publisher":{"@id":"https:\/\/www.controleng.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.controleng.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.controleng.com\/#organization","name":"Control Engineering","url":"https:\/\/www.controleng.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png","contentUrl":"https:\/\/www.controleng.com\/wp-content\/uploads\/2024\/12\/ce_logo.png","width":300,"height":93,"caption":"Control Engineering"},"image":{"@id":"https:\/\/www.controleng.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ControlEngineeringMagazine","https:\/\/x.com\/controlengtips","https:\/\/www.linkedin.com\/company\/control-engineering-magazine\/"]},{"@type":"Person","@id":"https:\/\/www.controleng.com\/#\/schema\/person\/0720f3911ac28c678dfe08782da7e8b7","name":"WTWH Media, LLC","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.controleng.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1a83181ac6a585839d531ef9c671e43aa2b789f85c10fd373ad3600ce1863632?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1a83181ac6a585839d531ef9c671e43aa2b789f85c10fd373ad3600ce1863632?s=96&d=mm&r=g","caption":"WTWH Media, LLC"},"url":"https:\/\/www.controleng.com\/author\/wtwh-media-llc\/"}]}},"_links":{"self":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/posts\/131163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/users\/1319"}],"replies":[{"embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/comments?post=131163"}],"version-history":[{"count":0,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/posts\/131163\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/media\/131171"}],"wp:attachment":[{"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/media?parent=131163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/categories?post=131163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/tags?post=131163"},{"taxonomy":"tracking-metric","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/tracking-metrics?post=131163"},{"taxonomy":"display-location","embeddable":true,"href":"https:\/\/www.controleng.com\/wp-json\/wp\/v2\/display-location?post=131163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}